Sunday, June 28, 2009

Still Catching Up



The live valley rafters have been insulated and tongue and groove pine is being attached. Before each board could go up, it had to be sanded, cleaned with a bleach water solution, and then polyurethane had to be applied. It was a hot and sticky job. Thanks to Renee and Charlie, the work load was shortened for Scott and I!









Scott is in the very tip top...about 28 feet high. The roof has about an 18 pitch.





No comments:

Post a Comment